Digital Transformation
Connect the systems you already run.
Integrations and automation between POS, shop, CRM, ERP and finance tools, so data moves once and nobody re-keys it.
What we deliver.
- 01Transformation roadmapA phased plan with go/no-go gates at each step. No big-bang cutovers, no death-march rewrites.
- 02Strangler-fig API layerA thin facade in front of the legacy system so new code can swap pieces without touching the monolith.
- 03Data migration runbooksTested in shadow mode before any production cutover. Rollback documented before any forward step.
- 04Modernized incrementsWorking software at the end of every phase. Business continues to operate the whole time.
- 05Team training and handoverYour team owns the new architecture by the end. Documented patterns, paired delivery, code review.
What we don't do.
- Big-bang rewrites — every transformation is incremental and reversible. If a phase fails, the legacy system keeps running.
- Hide the cost — we surface migration risk and cost in writing before any work starts. Surprises stay in the discovery phase.
- Lock you to us forever — the goal is to graduate your team to operate the new architecture independently within the engagement.
How a project runs.
-
System health check
We map what you run, how it connects and where the risk sits, then hand you a written plan, whether or not you build with us.
-
A plan you sign off
Scope, sequence and price agreed in writing before any work starts.
-
Weekly increments
Working software every week, shown in a demo, so you see progress rather than status reports.
-
Handover and support
Code, documentation and runbooks handed over. We stay on for support if you want us to.
Tools we use.
Frontend
Backend
Cloud
Data
Recent work.
Common questions.
01What's the strangler fig pattern?
A way to replace a legacy system gradually: new functionality lives behind a facade, old functionality migrates piece by piece, and the legacy system shrinks until it disappears. Zero-downtime by construction.
02Can you work with our existing team during a migration?
Yes — paired delivery is the default. Our engineers and yours work side by side so the new patterns transfer as the migration progresses.
03How do you de-risk a data migration?
Shadow-mode dual-writes for weeks before any read cutover. Reconciliation reports daily. Rollback path documented and tested before the forward step.
04How long does a typical transformation take?
Assessment is 2 weeks. Phased implementation runs 3–6 months for most mid-sized monoliths, longer for systems with regulatory complexity.
Three ways to work with us.
- 01
System health check
A fixed-fee assessment of what you run, ending in a plan you can act on with us or without us.
Choose this if you need clarity before committing.
Book a health check - 02
Dedicated Team
2–8 engineers embedded in your workflow on a monthly retainer.
Choose this if you need ongoing build velocity.
Embed a Team - 03
Project-Based
Fixed scope, fixed timeline, fixed price for a locked-brief MVP.
Choose this if you have the spec and want a price upfront.
Define a Project
Not sure? Book a 15-min call — we'll point you to the right door.
Start here
Let's start with a system health check.
Tell us what you run and where it hurts. We'll come back with a scope and a fixed fee for the health check.